Beijing Oriental Dragon Commerce Trade Co., Ltd.

Batch-Off Machine XJJL-GC370

Batch-Off Machine   XJJL-GC370

BATCH-OFF MACHINE XJJL-GC370 

match with internal mixer 370 

 

Date: April 14, 2015 

 

 Delivery time:  80 work days

 

 

Technical parameter

1. Working condition:

Application: it is used for cooling the rubber sheet from twin-screw extruder or open mill.

1.2 Working system: Three shift/day, 7 days/week

1.3 Environment: Max. temp. 40℃,Min. temp. 5℃;

Relative humidity: Max. 90 %;

1.4 Power supply: AC 400/240 ± 10 %V,50 Hz ± 2 %;3 phase

1.5 Pressure of cooling water: 0.4 MPa,water temperature: 20~30℃

1.6 Air pressures: 0.5~0.8MPa

1.7 Measuring system: Metric system except pipe thread

 

2. Scope of supply:

2.1 Take-away device                                                             one set

2.2 Print device                                                                       one set

2.3 Splice device                                                                     one set

2.4 Insulation agent dipping device                                        one set

2.5 Clamping and lift device                                                   one set

2.6 Festoon with cooling device                                              one set

2.7 Platform and steps on the platform                                    one set

2.8 Joint-changing device                                                        one set

2.9 Stacker on the second floor                                               one set

2.10Weighing and print device                                                one set

2.11 Three position pallet moving device                                one set

2.12 Pneumatic system                                                             one set

2.13 Electrical control system                                                  one set

2.14 Technical documents                                                        one set

 

3. Main technical parameters

3.1Max.width of sheet                                                            900mm

3.2 Sheet thickness                                                                 8~12mm

3.3 Max. length of sheet on hanging rod                               1400mm

3.4 Distance for hanging rod                                                 127mm

     Number for effective hanging rod                                    180 pieces

3.5 Linear speed of sheet transmission                                  10~30m/min

3.6 Cooling type                                                                    air cooling

3.7 Number of cooling fan                                                    56 sets

     Air volume of each fan                                                     6200m3/h

     Noise of fan                                                                     ≤74dB(A)

3.8 Sheet temperature after cooling          ≤+5℃ under room temperature

3.9 Type of sheeting                                  sheeting on the second floor (master mixing)

3.10 Ways of installation                                                     overhead installation

3.11 Water consumption                                                      ~30m3/h

3.12 Operation mode:automatic during production, and manual operation during maintenance

 

4. Main structure:

4.1 Take away device:

This device will use roller construction, it will be helpful to reduce the maintainance work and improve the usage life(compare with conveyor belt construction).The speed of take-away device can be adjusted automatically or manually according to the main machine(extruder or open mill). Transmission speed is controlled by converter.

 

4.2 Printing device:

It is used to mark on rubber sheet including two sets of letters of A-Z and digits of 0-9.

 

4.3 Splice device:

It is equipped with triplet, manual rotary valve and pressure cylinder, the manual rotary valve controls the cylinder to action the adjustable compression roller, this can press the incontinuous sheet together and achieve continuous sheeting.

 

4.4 Insulation  solution  tank 

Insulation  solution  circulation  tank  with  spray made of stainless steel and auxiliary water tank for cooling(temperature of insulation  solution  should  be  < 65℃ ),ci

 

4.5 Clamping and lifting device

It adopts clip band to conveying, the angle between the belt and floor is about 75°. The clip band is made of high-temperature resistant PVC conveyor belt. Below the clamp belt there is water tank. Above it there is dust collector. Our equipment has a quick roll, it will let  rubber  sheet  get  in  smoothly  without  rubber jammed. Camera system will be equipped for observation of operation.

 

4.6 Cooling device with festoons

Assembled in sections and there are blowers at closed side. There are air discharge opening and at both ends, there are two inspection doors and inside the cooling system there is lighting lamps controlled by switches at the  inspection doors. At the bottom movable floor is equipped for easy maintenance. A operation cabinet is set at the inlet and outlet of the sheet.

The driving motor for hanging rod adopts frequency conversion motor, moving speed of the rod can be controlled through converter.

 

4.7 Platform and steps on platform

The batch-off device should extend to the overhead platform, two ladders are set at the front end of the platform. The operator can climb to the platform from the floor, furthermore, there is a ladder between the second floor and the platform; the operator can climb to the second floor from the platform.

Elevated platform have safety barriers around.

 

4.8 Joint device

The device is conveying belt, mainly used for sheeting after festoon, and transmit the sheet to the second floor.

 

4.9 Sheet stacker on the second floor

It is to continuously stack the sheet after cooling.

The stacker can be driven by one AC motor, and the speed can adjust and can keep synchronously with take-away device, lift decive and hanging rod, etc.

Rubber sheet  stacker:  folding  length  can  be  adjusted  from  1000  to 1400mm.

 

4.10 Weighing and printing

There is pallet and electronic weigher, the rubber weigher has display and print function.

Weighing capacity: 1500 Kg,accuracy: ±0.5%

 

4.11 Three position pallet moving device:

It is composed of three position pallets. It will be driven by chain, and a electronic weigher will be installed under the Second position for weighing and it has automatic return to 0 function. The device will be installed under the floor.

 

4.12 Pneumatic control system:

It controls each cylinder’s action for take-away, splice and print. Pnuematic control elements use high-quality products with reliable performance.

 

4.13 Electrical control system:

4.13.1 The system can be operated by auto or manual mode. Manual mode is used for maintenance.

It is composed of one control cabinet, one main operation table, one operation box of stacker device on the second floor, emergency stop button and so on.

Control cabinet is set on the floor next to take-away device.

Main operation box is set on the floor next to take-away device.

And the stacker’s operation box is set beside the stacker device on the second floor.

4.13.2 Transmission speed of rubber sheet adopts variable frequency speed control system.

4.13.3 The whole line adopts OMRON PLC control.

4.13.4 Control way for fan is controlled by packet control, each motor has over-current protection breaker.

4.13.5 When the rubber sheet enters into the fan inlet, it will show alarm signal for rubber blocking.

4.13.6 Festoon length can be adjusted.

4.13.7 Weigher includes weighing sensor, measuring gauge and printer.

4.13.8 Fault diagnosis:

Avoiding the following signals: festoon blocking signal at the inlet of cooling system, emergency stop device installing on operation box, pull rope switches installed at proper position.

 

5. Main bought-in parts

No

Name and type

Brand

1

Convey belt

Kansai metal mesh belt

2

PLC

Omron

3

Frequency regulator

Schneider

4

Main low-voltage component

LG

5

Rubber weigher

METTLER  TOLEDO

 

Spare parts list2 years:The current quotation doesn’t include it.

No.

Equipment

Size

quantity

Note

1

 conveyor belt

400X4

4

 

2

Suspending lever

 

5

 

3

blower

0.37KW

2

 

4

chain

P=63.5

10

 

5

Bearing with seat

D=30

6

 

 

6. Assembling, debugging and inspection

6.1Buyer is responsible for assembling, lifting and moving. Supplier will send people for guidance.

6.2 Buyer is responsible for debugging.

6.3 Two-times Inspection:

A. After assembling in supplier’s plant buyer will inspect and ship it.

B. After assembling in buyer’s plant debugging will carry out then final inspection.

C. Performance of machinery is inspected according to specification. When continous 48 hours is carried out steadily and satisfied with buyer’s requirement buyer accepts it.

6.4 Supplier is responsible for monitoring assembling quality.

6.5 Supplier is responsible for guiding internal wiring.

6.6 Supplier is responsible for training the operating and maintenance.

6.7 Buyer is responsible for accommodation of debugging personnel

 

7. Technical documents

7.1 Technical document:include one blueprint diagram, one layout diagram and one outline drawing. Supplier will provide foundation diagram, layout diagram and outline drawing. All documents will provide in CAD, Word and CD as well.

7.2 technical manual include as follows,

7.2.1 Layout diagram

7.2.2 Manual includes foundation diagram,assembling diagram and assembling standard.

7.2.3 Electric schematic diagram and wiring diagram

7.2.4 Pipe and cable connecting diagram

7.2.5 Pneumatic and lubrication diagram

7.2.6 Spare parts diagram

7.2.7 Special tool and material for assembling

 

8. Others:

8.1 The equipment cannot be transferred to the third party for mapping without the consent of seller.

8.2 The buyer should confirm the equipment color during technical exchange, seller will paint according to buyer’s requirement.

8.3When the agreement signed by both parties, it is considered as an integral attachment for the sale contract and should immediately come into effect with the sale contract. For other unmentioned matters, it will be made according to the seller’s standard product, if the buyer wants to amend the technique half-way, it should be in written form to notice the other party. After both parties have agreed, it will be considered as a supplement agreement.

 

 

 

 

 

 

View as :

Currently, there is no product exhibited in Batch-Off Machine XJJL-GC370

View as :

Send an Inquiry to this supplier

Send an Inquiry to this supplier
* From
  To Zhang Ping
Beijing Oriental Dragon Commerce Trade Co., Ltd.
* Subject
* Message

Use English only Max. 2000 characters. (Min. 20)

Send
EC21.com does not guarantee the validity of product information or the credentials of sellers.

Browse: Manufacturer Directory Premium Suppliers Site Map

About EC21 Contact Us Terms & Conditions Report Item Online Trading Risks Product Listing Policy

Copyright (c)1997-2026 EC21 Inc. All Rights Reserved. EC21 in KoreanChinese

Business Registry Number: 120-86-03931 | Mall order sales Registration Number: 강남-5838